Model DCL12: Dynamometer Tension Link Load Cell

Dynamometer Tension Link Load Cell

The DCL12 & DCL12-S1 dynamometer tension link load cells are designed for the lowest profile possible because headroom is a precious commodity in many lifting applications.  The lifting eyes are rotated 90 degrees from each other allowing another axis of movement which is essential for lifts where the load may sway.  The DCL12 is manufactured from alloy steel and is powder-coated to prevent corrosion.  The load cell is built with a connector and includes the mating connector with a 10 meter 6-conductor cable (load cell cable length can be customized at the time of order).  
Load Cell Central also offers other tension link dynamometers with integral cables, stainless steel construction, and submersible load cells.

Capacities

(t) 0.5, 1, 2, 3, 5, 10, 20, 30, 50, 100

Reviews

There are no reviews yet for this product. Write a Review

add to cartProduct Pricing

Part No.CapacityDescriptionStatusPriceQty.
DCL12-0.5t500 kgLow-Profile Dynamometer Tension Link Load CellOut of Stock — Typical Lead Time: 2-4 Weeks$885.00
increase
decrease
DCL12-1t1,000 kgLow-Profile Dynamometer Tension Link Load CellOut of Stock — Typical Lead Time: 2-4 Weeks$885.00
increase
decrease
DCL12-2t2,000 kgLow-Profile Dynamometer Tension Link Load CellOut of Stock — Typical Lead Time: 2-4 Weeks$885.00
increase
decrease
DCL12-3t3,000 kgLow-Profile Dynamometer Tension Link Load CellOut of Stock — Typical Lead Time: 2-4 Weeks$885.00
increase
decrease
DCL12-5t5,000 kgLow-Profile Dynamometer Tension Link Load CellOut of Stock — Typical Lead Time: 2-4 Weeks$945.00
increase
decrease
DCL12-10t10,000 kgLow-Profile Dynamometer Tension Link Load CellOut of Stock — Typical Lead Time: 2-4 Weeks$990.00
increase
decrease
DCL12-20t20,000 kgLow-Profile Dynamometer Tension Link Load CellOut of Stock — Typical Lead Time: 4-6 Weeks$2,785.00
increase
decrease
DCL12-30t30,000 kgLow-Profile Dynamometer Tension Link Load CellOut of Stock — Typical Lead Time: 4-6 Weeks$4,370.00
increase
decrease
DCL12-50t50,000 kgLow-Profile Dynamometer Tension Link Load CellOut of Stock — Typical Lead Time: 4-6 Weeks$4,250.00
increase
decrease
DCL12-100t100,000 kgLow-Profile Dynamometer Tension Link Load CellOut of Stock — Typical Lead Time: 6-8 Weeks$4,720.00
increase
decrease
DCL12-S1-0.5t500 kgLow-Profile Dynamometer Tension Link Load CellOut of Stock — Typical Lead Time: 2-4 Weeks$690.00
increase
decrease
DCL12-S1-1t1,000 kgLow-Profile Dynamometer Tension Link Load CellOut of Stock — Typical Lead Time: 2-4 Weeks$690.00
increase
decrease
DCL12-S1-2t2,000 kgLow-Profile Dynamometer Tension Link Load CellOut of Stock — Typical Lead Time: 2-4 Weeks$690.00
increase
decrease
DCL12-S1-3t3,000 kgLow-Profile Dynamometer Tension Link Load CellOut of Stock — Typical Lead Time: 2-4 Weeks$790.00
increase
decrease
DCL12-S1-5t5,000 kgLow-Profile Dynamometer Tension Link Load CellOut of Stock — Typical Lead Time: 2-4 Weeks$1,275.00
increase
decrease
DCL12-S1-10t10,000 kgLow-Profile Dynamometer Tension Link Load CellOut of Stock — Typical Lead Time: 2-4 Weeks$1,100.00
increase
decrease
DCL12-S1-20t20,000 kgLow-Profile Dynamometer Tension Link Load CellOut of Stock — Typical Lead Time: 4-6 Weeks$1,200.00
increase
decrease
Additional Options
Part No.DescriptionStatusPriceQty.
2BS-2tBow Shackle for DCL12-0.5t to 2t Tension Link (Do Not Exceed Load Cell Capacity)Out of Stock — Typical Lead Time: 1-2 Weeks$255.00
increase
decrease
2BS-3.25tBow Shackle for DCL12-3t Tension Link (Do Not Exceed Load Cell Capacity)Out of Stock — Typical Lead Time: 1-2 Weeks$38.00
increase
decrease
2BS-5tBow Shackle for DCL12-5t Tension LinkOut of Stock — Typical Lead Time: 1-2 Weeks$41.00
increase
decrease
2BS-12.5tBow Shackle for DCL12-10t Tension Link (Do Not Exceed Load Cell Capacity)Out of Stock — Typical Lead Time: 1-2 Weeks$102.00
increase
decrease
2BS-20tBow Shackle for DCL12-20t Tension Link (Do Not Exceed Load Cell Capacity)Typical Lead Time: 1-2 Weeks$237.00
increase
decrease
2BS-30tBow Shackle for DCL12-30t Tension LinkOut of Stock — Typical Lead Time: 1-2 Weeks$320.00
increase
decrease
2BS-50tBow Shackle for DCL12-50t Tension LinkOut of Stock — Typical Lead Time: 4-6 Weeks$835.00
increase
decrease
2BS-110tBow Shackle for DCL12-100t Tension Link (Do Not Exceed Load Cell Capacity)Out of Stock — Typical Lead Time: 4-6 Weeks$2,805.00
increase
decrease
2BS-2.5tBow Shackle for DCL12-S1-0.5t to 2t Tension Link (Do Not Exceed Load Cell Capacity)Out of Stock — Typical Lead Time: 1-2 Weeks$33.00
increase
decrease
3BS-3.25tBow Shackle for DCL12-S1-3t Tension Link (Do Not Exceed Load Cell Capacity)Out of Stock — Typical Lead Time: 1-2 Weeks$14.00
increase
decrease
3BS-6.5tBow Shackle for DCL12-S1-5t Tension Link (Do Not Exceed Load Cell Capacity)Out of Stock — Typical Lead Time: 1-2 Weeks$27.00
increase
decrease
3BS-13.5tBow Shackle for DCL12-S1-10t Tension Link (Do Not Exceed Load Cell Capacity)Out of Stock — Typical Lead Time: 1-2 Weeks$67.00
increase
decrease
3BS-25tBow Shackle for DCL12-S1-20t Tension Link (Do Not Exceed Load Cell Capacity)Out of Stock — Typical Lead Time: 1-2 Weeks$160.00
increase
decrease

add to cart

Brochures

Features

  • Combined error 0.05% of full scale
  • Compensated temp. -10 to 50ºC
  • Safe overload 200% of full scale
  • Ultimate overload 500% of full scale
  • Mating connector with10 meter load cell cable included

Options

  • Shackles
  • Stainless steel load cell
  • Pelican® carry case

dcl12 load cell dimensions

dcl12 load cell specifications

There are no reviews yet for this product. Write a Review

Product Bulletins